Services

Building permits and licensing in Lisbon

We prepare and submit your application to the municipality and follow it until a decision, for new works and for legalising existing ones.

Renovating in Portugal often requires an application to the municipality (Câmara Municipal): a prior notice (comunicação prévia) or a licence (licenciamento), depending on the works. Some works are exempt.

We can confirm whether or not your works are exempt from licensing, through a consultation, a survey or a feasibility study. When an application is needed, we handle it in Portuguese on your behalf.

What is included

  • Review of the rules that apply to your property: municipal plan, protected areas, condominium
  • Prior information requests (PIP) to the municipality
  • The architectural drawings and written documents required for the application
  • Coordination of the engineering projects with partner engineers
  • Submission to the municipality and replies to its requests
  • Legalisation of works carried out without a permit, when this is possible
  • Applications relating to the authorised use of the property

How it works

  1. 01

    Documents and records

    We review the property's documents and, when needed, the municipal archives.

  2. 02

    Brief and procedure

    We define the brief with you and identify the procedure the municipality requires.

  3. 03

    Application

    We prepare the drawings and documents, and submit the application.

  4. 04

    Follow-up

    We follow the application with the municipality, chasing it up frequently, and keep you informed of each successive decision.

Common questions

Do I need a permit to renovate an apartment?

It depends on the works. Changes to the facade or to the use of the property generally require an application. For the structure, it depends on the case: this needs to be discussed with us in a meeting. Interior finishing works often do not. We can confirm this for you.

What is a PIP?

A PIP (pedido de informação prévia) is a prior information request: the municipality states whether a project can be considered and gives an official answer, by which it is bound.

Can works done without a permit be regularised?

In some cases. When it is not possible as things stand, changes are sometimes needed. We assess the situation with you and present it at a feasibility-study meeting. If it is possible, we go ahead with a project.

How long does the municipality take?

It varies with the municipality and the procedure. We give you an estimate at the start and tell you where the application stands as it progresses.

Tell us about your project

A call is the quickest way to see whether we can help. You can also write to us on WhatsApp or by email, in English, French or Portuguese.